top of page

prices

​

Mural fee

Projects range from between three days to two weeks to complete and the POA is worked out according to a set of variables:

​

Complexity of the design

Scale of the mural

Percentage of wall to be painted

Location/travel

Accessibility of the wall

​

The price includes insurance, labour, design and research, provision of all paint and materials including ladders. It doesn't include general repair and preparation of the wall, nor the base colour painting of the wall, nor any scaffolding.

_SFO2791.jpg.jpg

​​​

Design and research fee

After an initial consultation I provide a free quotation and two initial sketch designs based upon the brief. If you are happy to proceed, I'll require you to sign the quotation and send a 20% design fee to cover research, sketches, colour sample board and final mural design.

​

Preparation for external walls

The longevity of the mural is dependent upon the quality of the painted surface. I recommend exterior walls be power washed one week prior to priming to ensure adequate drying time.  Masonry primer/sealer is recommended for rough surfaced brick or concrete walls. Optional anti - graffiti varnish may also be included for an additional cost.

​

Payment breakdown

20%  Design and research 

80%  Balance upon completion of the mural 

bottom of page